Focus On Screening

Made in China, World Power

CASES

Secondary Mineral Separation After The Screw Separator Of Barite Mine

Material

Barite

Capacity:
12000cubic meters/day
Density:
20%
Equipment configuration:
  • 脱水筛

    Dewatering Vibrating Screen

Consulation Online Message

In the dressing of barite in Liuzhou, Guangxi, due to the high mud content of barite, it is necessary to wash mud by adding water and washing mud with helical separator first, and then separate the finished barite from muddy water. The disadvantages of dressing with spiral separator are: Only large barite ore can be selected, and about 20% of fine ore flows away with muddy water, which makes barite ore can not be fully recovered, resulting in waste of resources. After the equipment was renewed, the dehydration screen was installed after the screw separator, so that the mud water out of the water could be reprocessed by the dehydration screen twice,,and 2400 cubic meters of barite could be extracted from 12000 cubic meters of mud water treated daily, and the economic benefit was greatly improved.

Equipment

  • 脱水筛

    Dewatering Vibrating Screen

Material


    Warning: Use of undefined constant solution - assumed 'solution' (this will throw an Error in a future version of PHP) in /www/wwwroot/gaofusieving.com/wp-content/themes/xz-gaofu/single-solution.php on line 227
  • Tailings dry row

  • Washed sand

  • Potash feldspar dehydration

  • 城市污水脱水

    Sludge dewatering system

  • 细砂回收机

    Fine sand recycling machine

  • coal slurry dewatering

Online Message

Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
E-mail: gaoful@zhendongshai.com